Overhead service bare pole only 360 00.
Electric service pole replacement.
Overhead service to irrigation pivot.
The heavy lines that hang between the transformer and the house are collectively called the service drop these must be a minimum of 12 feet above a driveway.
Such application may be written oral or electronic.
Pole with meter base and 240v 200 amp disconnect.
Pole inspections are performed throughout the system on a routine basis.
Results from these inspections will determine the need for replacement.
Pole with 480v 30 amp disconnect.
Overhead service to mobile home.
If a pole s strength falls below code requirements due to decay or damage the pole is considered a reject and must be restored or replaced.
The path to power.
In the united states utilities generally follow minimum criteria established by the national electrical safety code nesc or california s general order 95 go95 by restoring or replacing a pole that is evaluated to have less than 67 of its.
Pole with 480v 60 amp disconnect.
When planning to install a new customer owned service pole prior to inspection by pg e personnel see the section verifying depth of customer owned poles on page 6 and figure 18 pole depth verification on page 17.
But that headline doesn t tell us why bring a utility line worker is so dangerous.
Overhead service to irrigation pivot.
Today i ll give you an electrocution lawyer s.
After setting the pole s the customer contractor must notify the local pg e inspector who will look at the.
The safe delivery of reliable electric service to our community.
Safety and inspection problems interfere with replacement of deteriorating rotting wooden power line poles leading to electrocutions of workers and the public recently i wrote about how utility line workers have one of the 10 most dangerous jobs in the u s.